9.
10. Route the ECC800 4G antenna cable from the cable tray to the top of cabinet
11. Route the 4G antenna cable into cabinet A1 through the cable hole on the
12. Connect the RF_Z antenna to the RF_Z antenna port on the ECC800.
----End

9.3.2 (Optional) Installing a PAD

Prerequisites
The PAD to be installed has been obtained.
Context
Tool: Phillips screwdriver
Materials: PAD and PAD charging cable
Skill requirement: common technician
Procedure
Step 1 Adjust the feet at the bottom of the PAD mounting support until they are in the
same width as the PAD. Route the PAD power cable through the cable hole in the
PAD mounting support and then connect the cable to the PAD.
Step 2 Adjust the feet in the upper part of the PAD mounting support and clip the PAD
into the mounting support.
Issue 07 (2022-12-15)
Push the sealing plate up at the cabinet side to separate the sealing plate
hook from the sealing plate mounting bracket, and remove the sealing plate.
A1 along the cable chain.
top, route the cable out through the cable manager, and connect the cable to
the 4G antenna port on the ECC800.
Figure 9-14 Installing the antenna