Huawei FusionModule1000A40 Installation Manual page 72

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Installation Guide
Step 7 Install the step ladder on the concrete pad with the expansion bolts securing
them. Remount the flat washers, spring washers, and nuts on the expansion bolts
and tighten the expansion bolts.
----End
Issue 07 (2022-12-15)
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Installing External Accessories for Pre-fab. Modules
64

Advertisement

Table of Contents
loading

Table of Contents