Huawei FusionModule1000A40 Installation Manual page 44

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Installation Guide
Category
ESD wrist strap
Table 4-2 Materials recommended for local purchase
Item
Model/Function
(Optional)
Installs awnings.
Silicone
sealant
(Optional)
Applies glue during awning installation.
Glue gun
Hacksaw
Cuts PPR pipes.
Water refill
DN25-PP-R, including the straight section, elbow, and
or
straight connector
condensate
pipe
Pipe thermal
10 mm thick thermal insulation foam, such as rubber-
insulation
plastic foam and glass wool
Pipe fastener
Supports pipes.
Cable tie
Binds and secures cables onsite.
Issue 07 (2022-12-15)
Scissors
Copyright © Huawei Digital Power Technologies Co., Ltd.
Tools and Materials
Rubber gloves
-
4 Installation Preparations
Heat shrink tubing
(diameter 20 mm-radial
shrinkage rate 50%-
operating temperature
range 55°C-105°C-length
10 mm)
-
Quantity
1 bottle
1 PCS
1 PCS
Depending on the
actual pipe route
Depending on the
actual pipe route
Depending on the
actual pipe route
1 package, 200 to
300 PCS
36