10
10.1 Connecting Input Power Cables for Pre-fab.
Modules
Prerequisites
Pre-fab. modules and external cable trays have been installed.
Preparations
Tools: crimping tool, Phillips screwdriver, adjustable wrench, cable cutter, heat gun
Materials: cable tie, cable, terminal, heat shrink tubing
Skill requirement: skilled technician
Procedure
Step 1 Open the door of the power PDB.
Step 2 Remove the plugs from the two cable holes at the bottom of the power PDB.
Figure 10-1 Removing the plugs from the cable holes
Issue 07 (2022-12-15)
Installing Cables Outside Pre-fab.
Copyright © Huawei Digital Power Technologies Co., Ltd.

10 Installing Cables Outside Pre-fab. Modules

Modules
98

Advertisement

Table of Contents
loading

Table of Contents