Huawei FusionModule1000A40 Installation Manual page 50

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Installation Guide
Stage
During hoisting
Preparations
Tools: crane, socket wrench, torque wrench, Phillips screwdriver, jack, steel hoisting
rope, level, level gauge, hammer drill, angle rule, marker, ink fountain, long
leather measuring tape, claw hammer, vacuum cleaner, step ladder
Materials: pre-fab. module to be hoisted, expansion bolt, angle steel bracket, and
lifting device (the lifting device shown in the following figure is recommended)
Skill requirement: skilled technician, common technician, crane driver
Procedure
Step 1 Adjust the pre-fab. module in the required direction, connect the steel hoisting
ropes, and hoist the pre-fab. module onto the concrete platforms.
When hoisting a pre-fab. module, ensure that the four corner fittings of the pre-
fab. module are aligned with the marked mounting positions for corner fittings on
the concrete platforms.
Issue 07 (2022-12-15)
Precautions
Do not allow any unauthorized people to enter the
hazardous areas and never stand under the crane arm
during hoisting.
Ensure that the crane is properly located and avoid long-
distance hoisting.
Keep the pre-fab. module stable and horizontal during
hoisting, and ensure that the diagonal gradient of the pre-
fab. module is within 5 degrees.
Lift and land a pre-fab. module slowly to prevent shock to
equipment inside it.
Remove the steel ropes after ensuring that the pre-fab.
module is placed evenly on the concrete platforms.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installing Pre-fab. Modules
42