Stage
Preparations
Tools: crane, torque wrench, steel hoisting rope, level
Materials: pre-fab. module to be hoisted, spacer
Skill requirement: skilled technician, common technician, crane driver
Procedure
Step 1 Adjust the pre-fab. module in the installation direction, connect the steel hoisting
ropes, and hoist the pre-fab. module onto the bases.
Figure 5-12 Hoisting a pre-fab. module
Step 2 Turn the twistlocks in the bases by 90 degrees to lock the pre-fab. module, and
tighten the twistlocks using a torque wrench.
Issue 07 (2022-12-15)
Precautions
Ensure that the crane is properly located and avoid long-
distance hoisting.
Keep the pre-fab. module stable and horizontal during
hoisting, and ensure that the diagonal gradient of the pre-
fab. module is within 5 degrees.
Lift and land a pre-fab. module slowly to prevent shock to
equipment inside it.
Remove the ropes after ensuring that the pre-fab. module is
placed evenly on the four bases.
Copyright © Huawei Digital Power Technologies Co., Ltd.