Mitsubishi Electric SV13/22 Programming Manual page 202

Table of Contents

Advertisement

7. POSITIONING CONTROL
M9039
0
M9074
2
X000
M9074 M2009 M9076
4
M51
11
M9074
M53
13
CIRCUIT END
Downloaded from
ManualsNet.com
(4) Operation timing
The operation timing for circular interpolation control using center point
designation is shown below.
PLC ready (M2000)
All axes servo start command
(M2042)
All-axis servo start accept flag
(M2009)
Positioning start command (X000)
SVST instruction
Axis 1 start accept flag (M2001)
Axis 2 start accept flag (M2002)
(5) Servo program
The servo program No. 51 for circular interpolation control using center point
designation is shown below.
<K 51>
ABS
Axis
1,
Axis
2,
Speed
Center
point
1,
Center
point
2,
(6) Sequence program
The sequence program which runs the servo program is shown below.
M2001
M2002
search engine
V
Circular interpolation control using center point
78541
designation
30000
Axis used
1000
End point address
45000
20000
Positioning speed
Center point address
M2000
M2042
M51
PLS
SET
M53
K
SVST
J1J2
51
M53
RST
7 − 50
Servo program No. 51
Axis 1,Axis 2
1
78541
Axis
2
30000
Axis
1000
1
45000
Axis
2
20000
Axis
Turns ON PLC ready.
Turns ON all axes servo start
command.
Turns ON servo program No. 51
start command flag (M53) when
X000 turns OFF → ON.
Servo program No. 51 execution
request.
Turns OFF M53 on completion
of servo program No. 51 execution
request.

Advertisement

Table of Contents
loading

This manual is also suitable for:

A172shcpunA171shcpun

Table of Contents