Optional) Installing A Cap (Applicable To Upflow Units) - Huawei NetCol8000-C070 User Manual

In-room chilled water smart cooling product
Hide thumbs Also See for NetCol8000-C070:
Table of Contents

Advertisement

NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
Figure 3-58 Connecting the pressure tubes
Step 4 Connect the differential pressure sensor cables to terminals 4, 5, and 6 of X502.
Step 5 Install the fan maintenance baffle plate.
----End
3.6.11 (Optional) Installing a Cap (Applicable to Upflow
Units)
Prerequisites
Issue 07 (2021-12-30)
Before installing the cap, attach the thermal insulation foam in the
accessories to the top beam of the smart cooling product, and ensure that the
reserved holes in the thermal insulation foam are aligned with the holes in
the beam. Check that the cap is intact and free from scratches, that the sheet
metal is not bent, and that the screws are secure.
Before installing the cap, reserve space on the top of the upflow unit. The
height of the reserved space must be greater than that of the cap.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
83

Advertisement

Table of Contents
loading

Table of Contents