Section 4
Analog inputs
13.8
kV
120
V
ANSI06000600 V3 EN-US
Figure 22: A Two phase-to-phase connected VT
Where:
1)
2)
Table continues on next page
76
A
B
C
13.8
kV
120
V
shows how to connect the secondary side of a phase-to-phase VT to the VT inputs on the IED
is the TRM where these three voltage inputs are located. It shall be noted that for these three voltage
inputs the following setting values shall be entered:
VTprim =13.8 kV
VTsec =120 V
Please note that inside the IED only ratio of these two parameters is used.
© Copyright 2017 ABB. All rights reserved
IED
2
13
1
AI 07(I)
14
15
AI 08 (V)
16
17
AI 09 (V)
18
19
AI 10(V)
20
21
AI 11(V)
22
23
AI 12(V)
24
1MRK 511 401-UUS F
5
3
SMAI2
BLOCK
^GRP2_A (A-B)
^GRP2_B (B-C)
^GRP2_C (C-A)
^GRP2N
#Not Used
TYPE
4
ANSI06000600-3-en.vsd
Bay control REC670
Application manual
AI3P
AI1
AI2
AI3
AI4
AIN