ABB Relion 670 Series Applications Manual page 72

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 4
Analog inputs
A
B
CT 800/1
Wye Connected
Protected Object
ANSI11000026 V5 EN-US
Figure 14: Wye connected three-phase CT set with its wye point away from the protected object
In the example, everything is done in a similar way as in the above described example (Figure 13).
The only difference is the setting of the parameter
TRM (item 2 in Figure
CTprim =600A
CTsec =5A
CTWyePoint =FromObject
The ratio of the first two parameters is only used inside the IED. The third parameter as set in this
example will negate the measured currents in order to ensure that the currents are measured
towards the protected object within the IED.
A third alternative is to have the residual/neutral current from the three-phase CT set connected
to the IED as shown in Figure 14.
66
C
1
IC
IB
IA
14
and 13):
© Copyright 2017 ABB. All rights reserved
IED
2
3
CTStarPoint of the used current inputs on the
1MRK 511 401-UUS F
4
SMAI_20_2
BLOCK
AI3P
REVROT
AI1
5
^GRP2_A
AI2
^GRP2_B
AI3
^GRP2_C
AI4
^GRP2N
AIN
ANSI11000026-5-en-.vsd
Bay control REC670
Application manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec670

Table of Contents