Site Preparation and Maintenance Records
This appendix provides a site planning list to use when preparing your site for the Cisco Nexus 7000 Series
switch and includes these sections:
•
•
•
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
Table 70: Site Planning Checklist , on page 251
complete before you install the Cisco Nexus 7000 Series switch. Your completion of each task ensures a
successful switch installation.
Table 70: Site Planning Checklist
Planning Activity
Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Physical access
• Maintenance access
Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric contamination
• Airflow
Site Preparation Checklist, on page 251
Contact and Site Information, on page 252
Chassis and Module Information, on page 253
C H A P T E R
lists the site planning tasks that we recommend that you
Verification Time and Date
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
11
251