Cisco Nexus 7000 Series Hardware Installation And Reference Manual page 204

Hide thumbs Also See for Nexus 7000 Series:
Table of Contents

Advertisement

Cisco Nexus 7009 Chassis Clearances
Figure 135: Clearances Required for a Front-Mounted Cisco Nexus 7009 Chassis in a Four-Post Rack
1
Cisco Nexus 7009 chassis
2
Cable management frames
3
Vertical rack-mount post
4
Vertical rack-mount post for neighboring rack
5
Nearest object or inside of cabinet
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
192
10
Left side clearance required with an
unobstructed opening to the hot aisle to exhaust
air
11
Chassis width
12
Side clearance recommended for cabinet
installations:
• use 11 inches (27.9 cm)
13
Side clearance recommended for open rack
installations:
• If next to another open rack, use 6 inches
(15.2 cm).
• If next to a wall, use 11 inches (27.9 cm).
14
Rear service clearance required to replace fan
trays and fabric modules
Technical Specifications

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7004Nexus 7009Nexus 7010Nexus 7018

Table of Contents