Underwriters Laboratories (Ul); 1: Requirements For All Installations; 2: Ul 864 9Th And 10Th Edition; 3: Requirements For Central Station Fire Alarm Systems - Honeywell IFP-75 Installation & Operation Manual

Addressable fire alarm control panel
Hide thumbs Also See for IFP-75:
Table of Contents

Advertisement

Underwriters Laboratories (UL)

CAUTION: INSTALLATION AND TEST
!
TO ENSURE PROPER OPERATION, THIS EQUIPMENT MUST BE INSTALLED ACCORDING TO THE ENCLOSED
INSTALLATION INSTRUCTIONS. TO VERIFY THAT THE EQUIPMENT IS OPERATING PROPERLY AND CAN
SUCCESSFULLY REPORT AN ALARM, THIS EQUIPMENT MUST BE TESTED IMMEDIATELY AFTER INSTALLATION,
AND PERIODICALLY THEREAFTER, ACCORDING TO THE ENCLOSED TEST INSTRUCTIONS.
CAUTION: LINE IN USE
!
IN ORDER FOR "ALARM DIALING EQUIPMENT" TO BE ABLE TO SEIZE THE PHONE LINE TO REPORT AN ALARM OR
OTHER EVENT WHEN OTHER CUSTOMER EQUIPMENT (TELEPHONE, ANSWERING SYSTEM, COMPUTER MODEM,
ETC.) CONNECTED TO THE SAME LINE IS IN USE, "ALARM DIALING EQUIPMENT" MUST BE CONNECTED TO A
PROPERLY INSTALLED RJ31X JACK. THE RJ31X JACK MUST BE CONNECTED IN SERIES WITH, AND AHEAD OF, ALL
OTHER EQUIPMENT ATTACHED TO THE SAME PHONE LINE. SERIES INSTALLATION OF AN RJ31X JACK IS DEPICTED
IN THE FIGURE BELOW. IF YOU HAVE ANY QUESTIONS CONCERNING THESE INSTRUCTIONS, CONSULT YOUR
TELEPHONE COMPANY OR A QUALIFIED INSTALLER ABOUT INSTALLING THE NECESSARY JACK AND ALARM
DIALING EQUIPMENT.
2.2 Underwriters Laboratories (UL)
2.2.1 Requirements for All Installations
General requirements are described in this section. When installing an individual device, refer to the specific section of the manual for addi-
tional requirements. The following subsections list specific requirements for each type of installation (for example, Central Station Fire
Alarm systems, Local Protected Fire Alarm systems, and so on). See Section 10.6.1 for information on releasing operation.
1.
All field wiring must be installed in accordance with NFPA 70 National Electric Code.
2.
Use the addressable smoke detectors specified in Section 7 of this manual.
3.
Use UL listed notification appliances compatible with the IFP-75 from those specified in the Appendix at the back of this manual.
4.
A full system checkout must be performed any time the panel is programmed.
Restricted Options:
The loss of AC signal is defaulted to 3 hours however the system allows settings from 0 - 30 hours. For UL certified installations this
number must be set from 1 to 3 hours.
The system allows the use of non-latching spot type smoke detectors. This feature may not be used in commercial applications whereby
a general alarm is sounded. It is intended for elevator recall, door holding applications, and hotel/motel room applications.
The system allows the Alarm Verification time to be set from 60 to 250 seconds. For UL certified installations the setting must be a
maximum of 60 seconds.
The systems allows the Auto-resound time to be set to 4 or 24 hours. For UL certified installations that are utilizing SWIFT devices, the
value must be set to 4 hours.
Call forwarding shall not be used.
When two count is used detector spacing shall be cut in half, you shall not use the alarm verification feature, and no delay shall be used.
P.A.S (positive alarm sequence) feature shall be used only with automatic detectors.
2.2.2 UL 864 9th and 10th Edition
Per the UL Continuing Certification Program, UL 864 9th edition fire alarm control equipment will retain certification after the roll-out
of UL 10th edition (12/2/2018).
Installations of UL 864 10th Edition certified equipment are permitted to use UL864 9th Edition certified equipment when approved by
the local Authority Having Jurisdiction (AHJ).
For product compliance, refer to the UL/ULC listing cards located on the UL online certification directory. https://iq.ulprospector.com
2.2.3 Requirements for Central Station Fire Alarm Systems
1.
Use both phone lines. Enable phone line monitors for both lines.
2.
You must program a phone number and a test time so that the IFP-75 shall automatically initiate and complete a test signal transmission
sequence to its associated receiver at least once every 6 hrs. The AC Loss Hours option must be set from 1-3 hours.
3.
If using wired Ethernet or cellular, you must program the corresponding account/subscriber ID and a test time so that the FACP shall
automatically initiate a test signal transmission sequence to its associated receiver at least once every 6 hours.
2.2.4 Requirements for Local Protected Fire Alarm Systems
At least one UL listed supervised notification appliance must be used.
2.2.5 Requirements for Remote Station Protected Fire Alarm Systems
1.
Do not exceed the current load restrictions shown in Section 3.7.
2.
The AC Loss Hours option must be set from 1-3 hours.
IFP-75/IFP-75HV Installation/Operation Manual — P/N LS10147-001SK-E:D 06/25/2021
Agency Listings, Approvals, and Requirements
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Farenhyt seriesIfp-75hv

Table of Contents