ABB ACSM1 Firmware Manual page 16

Speed and torque control program
Hide thumbs Also See for ACSM1:
Table of Contents

Advertisement

16
The start-up may only be carried out by a qualified electrician.
The safety instructions must be followed during the start-up procedure. See the safety
instructions on the first pages of the appropriate hardware manual.
Check the installation. See the installation checklist in the appropriate hardware manual.
Check that the starting of the motor does not cause any danger.
De-couple the driven machine if
- there is a risk of damage in case of an incorrect direction of rotation, or
- a normal ID run
when the load torque is higher than 20% or the machinery is not able to withstand the
nominal torque transient during the ID run.
Install the DriveStudio PC tool to the PC. For instruction, see DriveStudio User Manual
[3AFE68749026 (English)].
Connect the drive to the PC:
Connect the other end of the communication cable (OPCA-02, code: 68239745) to the panel
link of the drive. Connect the other end of the communication cable via USB adapter or
directly to the PC serial port.
Switch the power on.
Start the DriveStudio program by clicking the DriveStudio icon on the
PC desktop.
Check whether an application program exists using the DriveSPC tool.
If an application program already exists, NOTE that some of the drive
functions may have been disabled. ENSURE, that the application
program is suitable for your drive application.
Switch to local control to ensure that external control is disabled by
clicking the Take/Release button of the PC tool control panel.
Start-up
(99.13 IDRUN MODE
Safety
=
(1)
NORMAL) is required during the drive start-up,
PC tool
Power up
7-segment display:
->

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents