Attaching A Chassis Ground Connection - Cisco CE 2000 Platform SCE 2000 4xGBE Installation And Configuration Manual

Cisco systems ce 2000 platform installation and configuration guide
Hide thumbs Also See for CE 2000 Platform SCE 2000 4xGBE:
Table of Contents

Advertisement

Chapter 4
Installation and Maintenance
Step 4
Figure 4-9: Securing the SCE 2000 to the Rack
Step 5
Note
Since the brackets support the weight of the entire SCE 2000 chassis, be sure to use all four screws to
fasten the two rack-mount brackets to the rack posts.

Attaching a Chassis Ground Connection

Before you connect the power or turn on the power to the SCE 2000 platform, it is required that
you provide an adequate chassis Ground (protective earth) connection for the SCE 2000 chassis.
A Grounding kit is provided with each SCE 2000.
Use the Grounding kit to properly ground the SCE 2000 chassis (see SCE 2000 Component List
(on page 2-7) for details).
When installing the unit, the chassis ground connection must always be made first and disconnected
Warning
last.
OL-7824-02
While keeping the brackets flush against the posts or mounting strips, align the holes in
the brackets with the holes on the rack or mounting strip.
For each bracket, insert and tighten two appropriate screws to the rack.
SCE 2000 4xGBE Installation and Configuration Guide
Installing the SCE 2000 Platform
4-13

Advertisement

Table of Contents
loading

Table of Contents