Chapter 4
Installation and Maintenance
Installing the SCE 2000 Platform
A rack with both front and back posts will have the crossrail supports installed. Slide the SCE 2000 onto
these crossrails and push it all the way back.
Figure 4-8: Sliding the SCE 2000 into the Rack
SCE 2000 4xGBE Installation and Configuration Guide
4-12
OL-7824-02