1: 5815Xl Connection To The Panel - Honeywell Silent Knight SK318PT Installation And Operation Manual

Addressable fire system, emergency voice system
Table of Contents

Advertisement

To install the 5815XL:
1.
Make sure power is off at the panel.
2.
Mount the 5815XL in the 6820 cabinet, the 5895XL cabinet, or the 5815RMK remote mounting kit. Use the standoffs located under
the control panel board assembly and secure with screws provided with the 5815XL. For additional information, also see Model
5895XL Installation Instructions (P/N 151142) or 5815RMK Remote Mounting Kit Installation Instructions (P/N 151391).
3.
Connect the 5815XL to the control panel. (See Section 4.8.1.)
4.
Use on-board DIP switches to select an SBUS ID#. (See Section 4.13.1).
5.
The new 5815XL module must be added to the system through programming. JumpStart will add the module automatically (see
Section 8.1). You can also add it manually (see Section 9.2.2). Select a name, if desired.
6.
You are now ready to connect SLC devices to the 5815XL (see Section 9.5.1).
Figure 4.29 is a drawing of the 5815XL board, showing the location of terminals and DIP switches.
4.8.1 5815XL Connection to the Panel
Connect the 5815XL to the control panel as shown in Figure 4.30. After the 5815XL is connected to the panel, it must be added to the
system. This programming step is described in Section Figure 4.13.
46
DIP Switch
Figure 4.29 5815XL Board
Supervised
Power Limited
Figure 4.30 5815XL Connection to Main Panel Assembly
6820 / 6820EVS Manual P/N LS10144-001SK-E:C 09/28/2017

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Silent knight 6820Silent knight 6820evs

Table of Contents