Cisco 6800 Series Administration Manual page 41

Hide thumbs Also See for 6800 Series:
Table of Contents

Advertisement

Hardware Installation
Step 2
Mark the placement of the screws.
• Without the ceiling mount bracket: Mark the line so that the screws are 2.126 inches (54 mm) apart
(center to center).
• With the ceiling mount bracket: Hold the bracket so that two of the holes intersect the line. Mark the
holes.
Step 3
Install the wall plugs as described by the manufacturer.
Step 4
Insert the screws.
• Without the ceiling mount bracket: Screw in the screws until there is about 0.375 inches (9.52 mm)
between the screw head and the wall.
• With the ceiling mount bracket: Hold the bracket over the holes and screw in the screws until the bracket
doesn't move.
Step 5
Base station only: Connect the Ethernet cable to the base station and route the cable through the slot in the
base station.
Step 6
Provide power to the device:
• Base station with PoE on the LAN: Additional power is not required.
• Base station without PoE: Plug the power adapter into the base station and route the cable through the
slot in the base station.
• Repeater: Plug the power adapter into the repeater and route the cable through the slot in the repeater.
Mount the Base Station or Repeater on the Wall
Cisco IP DECT 6800 Series Administration Guide
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

68236825

Table of Contents