Hardware Installation
• Base station: LAN connection close to the mounting location.
• Base station: If you do not use PoE, a power outlet close to the mounting location.
• Repeater: A power outlet close to the mounting location.
• Ensure that the base station can communicate with the network (see
25). After it can communicate and the LED is green, you can unplug the cables.
Determine the best placement, taking into account the coverage area and the building construction materials.
• If you have a 110 Single-Cell Base Station, you may need to add another 110 Single-Cell Base Station
or additional 110 Repeaters.
• If you have a 210 Multi-Cell Base Station, you may need to add additional base stations or repeaters.
You can use the site survey tool on the handset to plan placement.
Procedure
Step 1
Hold the ceiling mount bracket in the desired location.
Step 2
Mark the screw placement.
Step 3
Install the plugs as described by the manufacturer.
Step 4
Install the screws through the bracket and into the plugs.
Mount the Base Station or Repeater on the Ceiling
Install the Base Station, on page
Cisco IP DECT 6800 Series Administration Guide
27