Huawei USG6000E Series Hardware Manual page 540

Hide thumbs Also See for USG6000E Series:
Table of Contents

Advertisement

HUAWEI USG6000E Series
Hardware Guide
Procedure
----End
Follow-up Procedure
After the USG is powered on, you can log in to the configuration page for
management and maintenance. For details, refer to the Configuration Guide.
5.4 Installing a 420 mm Deep Device
This chapter provides the cabinet-mounting, workbench-mounting, and cable
connection methods of the USG6515E, USG6525E, USG6550E, USG6555E,
USG6560E, USG6565E, USG6575E-B, USG6580E, USG6585E, USG6605E-B,
USG6610E, USG6615E, USG6620E, USG6625E, USG6630E, USG6635E, USG6650E,
USG6655E series.
Issue 08 (2022-04-20)
Power on the USG.
The USG starts after the switch of the power supply device is turned on.
You can identify the USG status based on indicators on the front panel.
Indicators shown in
Figure 5-19
Figure 5-19 Indicators when the USG runs normally
Power off the USG.
NO TICE
Before powering off the USG, ensure that configuration data is saved.
Otherwise, the configuration data may be lost.
If the USG will be administratively shut down for a long time, turn off the
power switch. After powering off the USG, set it aside properly according to
storage requirements.
Copyright © Huawei Technologies Co., Ltd.
indicate that the USG is running normally.
5 Hardware Installation
533

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents