Huawei USG6000E Series Hardware Manual page 528

Hide thumbs Also See for USG6000E Series:
Table of Contents

Advertisement

HUAWEI USG6000E Series
Hardware Guide
Tools
Procedure
Step 1 Loosen and remove the screw of the ground terminal on the USG rear panel.
Step 2 Connect the OT terminal at one end of the PGND cable to the connection hole of
the USG, with the conducting wire upward, and tighten the M4 screw, as shown in
A of
Figure 5-11 Installing the OT terminal
Step 3 Connect the M6 end of the PGND cable to the ground terminal of the cabinet,
workbench, or wall. The tightening torque of the M6 screw is 4.8 N·m.
Issue 08 (2022-04-20)
Phillips screwdriver
Multimeter
Figure
5-11, and tighten the M4 screw. The tightening torque is 1.4 N·m.
NO TE
The ground cable of the USG6510E, USG6510E-POE, USG6530E must be routed upwards.
Copyright © Huawei Technologies Co., Ltd.
5 Hardware Installation
521

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents