Mitsubishi Electric MELSEC iQ-R Series User Manual page 274

Programmable controller
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Clearing devices
The devices of this product (Y, M, B, D, and W) can be cleared to '0' in the "CPU Memory Operation" screen of CW
Configurator.
[Online]  [CPU Memory Operation]
For details on the "CPU Memory Operation" screen, refer to the following:
CW Configurator Operating Manual
■Execution of clearing devices
The devices may not be cleared depending on the Y output status of this product. (Page 28 Y output status)
: Can be executed, : Cannot be executed
Y output status
Y OUT
Y STOP
PAUSE
The status of the BUS RESET/Y STOP/Y OUT switch and Y output status may differ depending on the remote
operations.
Check the Y output status with the special register (SD203). (Page 276 Special Register List)
APPX
272
Appendix 3 Device List
Clearing devices

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r melsecwincpu

Table of Contents