Connection Using Cc-Link Ie Tsn - Mitsubishi Electric MELSOFT FR Configurator2 Instruction Manual

Table of Contents

Advertisement

 Communication through GOT2000 and programmable controller
 Communication through GOT2000 and programmable controller (CC-Link IE Field Network)

1.4.11 Connection using CC-Link IE TSN

The inverter and FR Configurator2 can be communicated via a programmable controller (CPU module / Ethernet module).
USB connector/
Serial port
Personal computer
Ethernet
(FR Configurator2)
GOT to programmable controller
(CPU module, Ethernet module)
Programmable controller
(Ethernet module) to Inverter
Hub
Ethernet
connector
Inverter
USB connector
Personal computer
Ethernet
(FR Configurator2)
GOT to programmable controller
(CPU module, Ethernet module)
Programmable controller
(CC-Link IE TSN master module) to Inverter
Communication
CC-Link IE Field Network
connector
Inverter
GOT2000
USB/serial
cable
cable
Up to 64 or 120
inverters
GOT2000
USB
cable
cable
Up to
120 inverters
1.4 Connection and parameter setting
1
2
3
4
5
6
7
8
9
10
59
1. OUTLINE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sw1dnd-frc2-e

Table of Contents