Replacing An Elight Power Supply - Huawei FusionModule2000 V500R003C10 Maintenance Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000 V500R003C10:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Maintenance Guide
Step 6 On the ECC800 WebUI, choose Maintenance > Opening Guide > Linkage Test > eLight
actuators Commissioning and click Test. The eLight strip light is lit up in red, green, blue,
and white in sequence for 3 seconds respectively, and then turns off.
----End

5.4.25 Replacing an eLight Power Supply

Impact on the System
The eLight strip light is off during replacement.
Preparations
Figure 5-79 Positions of the eLight actuator and power supply (Inside the aisle)
(1) AC actuator
(3) eLight actuator
Procedure
Step 1 Disconnect the upstream fuse for the eLight power supply.
Step 2 Label each cable based on the corresponding ports on the eLight power supply.
Issue 04 (2020-01-03)
Tools: ESD gloves, Phillips screwdriver, step ladder, label, marker
Material: eLight power supply
Copyright © Huawei Technologies Co., Ltd.
(2) Upstream fuse
(4) eLight power supply
5 Parts Replacement
118