FusionModule2000 Smart Modular Data Center
Maintenance Guide
5.4.24 Replacing an eLight Actuator
Impact on the System
The eLight strip light is off during replacement.
Preparations
(1) AC actuator
(3) eLight actuator
Procedure
Step 1 Label each cable based on the corresponding ports on the eLight actuator.
Step 2 Remove cables from the eLight actuator.
Step 3 Remove the old eLight actuator from guide rails.
Step 4 Install the spare eLight actuator in the original position and connect the cables.
Step 5 Check the parameters and communication status of the eLight actuator to ensure normal
communication.
Issue 04 (2020-01-03)
Tools: ESD gloves, Phillips screwdriver, step ladder, label, marker
Material: eLight actuator
Figure 5-78 Positions of the eLight actuator and power supply (Inside the aisle)
Copyright © Huawei Technologies Co., Ltd.
(2) Upstream fuse
(4) eLight power supply
5 Parts Replacement