Preparations
Procedure
Step 1 Remove three white rubber panels from the door frame.
Step 2 Remove the side covers from the posts.
Step 3 Cut off the cable tie that binds the strip light extension cable to the top of the post.
Step 4 Pull the strip light out of the bottom of the left post.
Step 5 Disconnect the strip light terminal from the strip light extension cable of the door post.
Step 6 Pull out the strip light from the fasteners.
Figure 5-77 Removing a strip light
(1) Strip light extension cable
Step 7 Install a new strip light.
Step 8 Install the new strip light by performing the preceding steps in reverse order.
Step 9 On the ECC800 WebUI, choose Maintenance > Opening Guide > Linkage Test > eLight
actuators Commissioning and click Test. The eLight strip light is lit up in red, green, blue,
and white in sequence for 3 seconds respectively, and then turns off.
----End
Issue 04 (2020-01-03)
Tool: ESD gloves
Material: eLight strip light