Table 3-7 Quarterly maintenance for the management system
Item
Battery
management
parameter setting
Fire control
linkage function
Check the
connection of the
iBAT (BIM).
Issue 04 (2020-01-03)
Operation
on the main
screen, and set
the humidifier to
a certain value.
Operation
On the UPS
LCD, choose
System Info >
Settings >
Battery Param.
, and check
whether battery
management
parameter
settings meet
actual
requirements.
Simulate a
smoky
environment
under a smoke
detector or
multi-functional
sensor. (If real
smoke is not
allowed, press
the TEST button
on the sensor.)
Check whether
the iBAT (BIM)
is attached
firmly and
whether all
cables are
securely
Copyright © Huawei Technologies Co., Ltd.
Standard
Standard
Parameters are set
based on site
requirements.
A smoke alarm is
displayed on the
active alarm page of
the WebUI.
The skylight is
opened.
The alarm beacon
produces audible
and visual alarms.
The iBAT (BIM) is
attached firmly.
All iBAT (BIM)
cables are securely
connected.
No iBAT (BIM)
cable deteriorates
3 Routine Maintenance
Troubleshooting
inlet solenoid valve.
If no water is
supplied to the wet
film humidifier,
check the cable
connection to the
water pump or
replace the
humidifier pump.
Troubleshooting
Set parameters
correctly.
Check whether the
smoke detector or
multi-functional
sensor is faulty.
Check whether the
skylight system is
normal.
If the alarm beacon
produces audible
and visual alarms,
check whether the
alarm beacon is
faulty and whether
the cable connection
is proper.
Secure the iBAT
(BIM) again.
Check that all iBAT
(BIM) cables are
securely connected.
Replace the faulty
cable.