Figure 5-67 Removing a pad power connector from its holder (BOM number: 14190242)
Step 7 Assemble the pad power connector holder.
1.
2.
Figure 5-68 Assembling a pad power connector holder (BOM number: 14190892)
Figure 5-69 Assembling a pad power connector holder (BOM number: 14190242)
Issue 04 (2020-01-03)
Clamp the power connector to the guide rail of the holder.
Install the holder cover using three M4x12 screw assemblies.