Huawei SmartLogger1000 User Manual page 97

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
LCD
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
Operation Procedure
1. On the default screen, press
the main menu.
2. Select
and press
3. Select PLC and press
NOTE
PLC (3-249) in the left figure indicates that PLC is
connected to Port 3 of the SmartLogger, whose
RS485 address is 249.
The device status is displayed behind the
device name.
The subsequent operations are as follows:
To view the running information of the
PLC, perform step 4 to 6.
To view the version information of the
PLC, perform step 7 only.
4. Select Running and press
6 User Interface
to enter
.
.
.
84

Advertisement

Table of Contents
loading

Table of Contents