Huawei SmartLogger1000 User Manual page 208

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
No.
Parameter
13
Remote
power
schedule
14
Schedule
instruction
valid duration
Maximum
15
apparent
power
16
Maximum
active power
17
Shutdown at
0% power
limit
18
Reactive
power
compensation
(Q/S)
Reactive
19
power
compensation
(PF)
Issue 12 (2019-01-15)
Description
If this parameter is set to
Enable, the inverter
responds to the scheduling
instruction from the
remote port. If this
parameter is set to
Disable, the inverter does
not respond to the
scheduling instruction
from the remote port.
Adjusts the duration
within which the
scheduling instruction is
valid.
Specifies the output upper
threshold for the
maximum apparent power
to adapt to the capacity
requirements for standard
and customized inverters.
Specifies the output upper
threshold for the
maximum active power to
adapt to various market
requirements.
If this parameter is set to
Enable, the inverter shuts
down after receiving the
0% power limit
instruction. If this
parameter is set to
Disable, the inverter does
not shut down after
receiving the 0% power
limit instruction.
Adjusts the inverter
output reactive power.
Adjusts the power factor
of the inverter.
Copyright © Huawei Technologies Co., Ltd.
Unit
Value Range
N/A
Disable
Enable
s
[0, 86400]
[Maximum active
kVA
power, Smax_limit]
kW
[0.1, Pmax_limit]
N/A
Disable
Enable
N/A
(–1.000, 1.000]
(–1.000,
N/A
–0.800]U[0.800,
1.000]
7 WebUI
Remarks
N/A
If this parameter is
set to 0, the
instruction is valid
permanently.
If the maximum
active power equals
Smax_limit, this
parameter is not
displayed.
N/A
N/A
N/A
N/A
195

Advertisement

Table of Contents
loading

Table of Contents