Huawei SmartLogger1000 User Manual page 254

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
Figure 7-67 Network diagram (with a circuit breaker)
In the scenario with circuit breaker, put the power supply position of the SmartLogger before
the circuit breaker to avoid the SmartLogger power-off after the DO control circuit breaker is
switched off.
Setting Parameters
Before setting the parameters, ensure that the Modbus power meter and inverter are connected
to the WebUI. Then take the following steps to complete the settings.
1.
Parameter
Communication
interrupt shutdown
Communication
resumed startup
Communication
interruption duration
Issue 12 (2019-01-15)
Log in as Advance User, choose Monitoring > SUN2000 > Running Param. >
Feature Parameters, and set the following parameters.
Description
The standards of certain countries
and regions require that the
inverter must shut down after the
communication is interrupted for a
certain time.
If this parameter is enabled, the
inverter automatically starts after
communication recovers. If this
parameter is disabled, the inverter
needs to be started manually after
communication recovers.
Specifies the duration for
determining communication
interruption, and is used for
automatic shutdown for protection
in case of communication
interruption.
Copyright © Huawei Technologies Co., Ltd.
7 WebUI
Recommended Value
Enable
Enable
1
241