Grid Parameters
Table 7-6 Parameter description
No.
Parameter
1
Grid code
2
Output mode
3
PQ mode
4
Auto start
upon grid
recovery
5
Grid
connection
duration after
power grid
recovery
Issue 12 (2019-01-15)
Description
Set this parameter based
on the grid code of the
country or region where
the inverter is used and the
inverter application
scenario.
Specifies whether the
inverter has an output
neutral wire based on the
inverter application
scenario.
If PQ mode 1 is selected,
the maximum AC output
power equals the
maximum apparent power.
If PQ mode 2 is selected,
the maximum AC output
power equals the rated
output power.
Specifies whether to allow
the inverter to
automatically start after
the power grid recovers.
Specifies the waiting time
for inverter restart after the
power grid recovers.
Copyright © Huawei Technologies Co., Ltd.
Unit
Value Range
N/A
N/A
N/A
Three-phase
three-wire
Three-phase
four-wire
N/A
SUN2000-36K
TL: PQ mode
1 (Pmax = 40
kW), PQ mode
2 (Pmax = 36
kW)
SUN2000-42K
TL: PQ mode 1
(Pmax = 47
kW), PQ mode
2 (Pmax = 42
kW)
SUN2000-50K
TL-M0,
SUN2000-60K
TL-M0: PQ
mode 1, PQ
mode 2
N/A
Disable
Enable
s
[0, 900]
7 WebUI
Remarks
N/A
This parameter is
supported by the
SUN2000-33KTL,
SUN2000-33KTL-A,
SUN2000-36KTL,
SUN2000-50KTL-M0,
SUN2000-60KTL-M0,
and the inverters named
with -US.
This parameter is
supported by the
SUN2000-36KTL,
SUN2000-42KTL,
SUN2000-50KTL-M0,
and
SUN2000-60KTL-M0.
N/A
This parameter can be
set to [150, 900] for the
1000 V and 1100 V
inverters under the
Japanese grid codes.