Increasing number of steps by the process control extension
When the process control extension is enabled, the number of steps increases comparing when it is not used.
The following table lists the increasing number of steps.
Execution type of program file
Scan
Fixed scan
Program block
M+PHEADER
M+PFOOTER
Other than above
All
Increasing number of steps
Approximately 1400 steps
Approximately 30 steps
Approximately 10 steps
Approximately 60 steps
Appendix 2 Approximate Number of Steps
A
APPX
593