Commissioning
The following parameters appear with the selection Flashing:
The output starts to flash as soon as the parameterized value is received in the communication object
Switch. The flashing period can be adjusted via the parameterized time duration for ON or OFF. The out-
put is switched on at the start of the flashing period. When a new value is received on the communication
object Switch, the flashing period will recommence. The relay state after flashing can be programmed. The
communication object Status switch indicates the current relay state during flashing.
Note
Only a certain number of switching actions are possible per minute and Energy Actuator. With frequent
switching, a switching delay can occur, as only a certain number of switching actions are possible per
minute, see
When the function Flashing is selected, the service life of the switching contacts must be considered,
see
With a telegram to the communication object Disable function time, the function Flashing can be disa-
bled. The parameterization for this purpose is implemented in the parameter window
page 55, with the parameter Value object "Disable function time" after bus voltage recovery and ETS
reset.
Technical
data, page 7. The same applies directly after bus voltage recovery.
Technical
data, page 7.
A:
Function,
SE/S 3.16.1 | 2CDC 505 084 D0203 63