ABB i-bus KNX Product Manual page 41

Energy actuator se/s 3.16.1
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

ABB i-bus
KNX
Commissioning
Reset "Intermediate meter reading total"
on trigger 1 (Start)
Options:
This parameter determines whether the Intermediate meter total (Meter reading) is reset when a telegram
is received on the communication object Trigger 1.... Alternatively, an additional 1 bit communication ob-
ject can be enabled, see parameter
page 41.
Send "Intermediate meter reading total"
on trigger 1 (Start)
Options:
This parameter determines whether the Intermediate meter total (Meter reading) is sent when a telegram is
received on the communication object Trigger 1....
Trigger 2 is activated by
Options:
1 bit object: The 1 bit communication object Receive trigger 2 (Intermediate meter total) is enabled.
The meter reading is sent if a telegram with the value 1 is received on this communication object. It is
possible to parameterize whether the intermediate meter stops or does not stop.
Time: The 3 byte communication object Trigger 2 change time (Intermediate meter total) is enabled.
Using this communication object, the time for trigger 2 can be modified. The following parameters
appear:
Hour [0...23]
Options:
0...23
Minute [0...59]
Options:
0...59
Weekday
Options:
Monday...Sunday
every day
The intermediate meter (meter reading) starts if the parameterized time is received on the commu-
nication object Receive time (General).
Note
The time is only required once per device for all meters.
yes
no
yes
no
1 bit object
Time
Limit
Duration
"Intermediate meter reading total" additionally resettable via
object,
SE/S 3.16.1 | 2CDC 505 084 D0203 39

Advertisement

Table of Contents
loading

Table of Contents