Checkout Procedures Completion - GE Dash 3000 Service Manual

Patient monitor
Hide thumbs Also See for Dash 3000:
Table of Contents

Advertisement

Checkout procedures completion

2000966-542D
Functional and electrical safety checks: Checkout procedures completion
This completes all tests associated with the checkout procedures.
1. Discharge the test patient admitted during the
page
8-22.
2. Set all test equipment power switches to the off position.
3. Unplug the patient monitor (or docking station) from AC power.
4. Remove all test equipment from the patient monitor (or docking
station).
5. GE recommends that the qualified personnel performing the tests
should record functional checkout test values in the
page D-1.
Dash 3000/4000/5000
"ECG tests" on
"Checklist"
on
8-55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dash 4000Dash 5000001c 051d 003a

Table of Contents