Figure 4-17 Removing sheet metal fasteners from the compressor
Step 6 Tighten the bolts on the compressors again to a torque of 12 N·m.
Step 7 Install the adjustable side panels for the compressor.
----End

4.4 Installing Cables

4.4.1 Precautions

Issue 02 (2021-04-15)
NO TE
● Do not remove the bolts.
● Keep the removed sheet metal fasteners properly for future transportation.
Connections of all power cables, control cables, and ground cables must
comply with local electrical regulations, and the cable specifications should
comply with local cabling specifications.
For details about the maximum current, see the device nameplate.
Check that the input voltage and frequency of the primary power supply meet
the requirements.
Only trained and qualified personnel are allowed to connect cables.
Before connecting cables, use a multimeter to measure the input voltage and
ensure that the power supply is disconnected.
All smart cooling products must be securely grounded before being powered
on.
Cables should be securely connected and free of contact with components,
such as the fan.
When laying out cables, ensure that the power cables and signal cables are
reliably separated and that electric and extra low voltage (ELV) cables are
bound separately.
Cable colors in this document are for reference only.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation (FDC Scenario)
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-e240h4

Table of Contents