Fe Teamwork + Fe Monitoring; Installing Power Cables - Huawei FusionCol8000-E240 User Manual

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual

4.4.4.5 FE Teamwork + FE Monitoring

Step 1 Connect teamwork and monitoring communications cables.
Networking
Protocol
Note
Figure 4-26 Connecting communications cables
----End

4.4.5 Installing Power Cables

Procedure
Step 1 Route power cables through the external cable holes.
Step 2 Open the electric control box outside the unit.
Step 3 Connect one end of the active and standby power cables to the active/standby
power supply terminals/PE terminal through the cable holes in the electric control
box of the unit, and connect the other end to the power supply.
Figure 4-27 Connecting power cables
Issue 02 (2021-04-15)
Teamwork
MAC_CAN
One teamwork network
supports a maximum of 16
smart cooling products.
NO TE
Customers can purchase Huawei's switch and NetEco for the monitoring system.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation (FDC Scenario)
Monitoring
Modbus-TCP/SNMP
-
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-e240h4

Table of Contents