Huawei FusionCol8000-E240 User Manual page 48

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E240:
Table of Contents

Advertisement

FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
Figure 3-5 Concrete platforms for combined units (unit: mm)
(1) FusionCol8000-E
Step 2 Determine the reference points for installing the device on the concrete platforms.
Mark the reference points using a marker.
Step 3 Mark the positions of the four corner fittings using an ink fountain and long
leather measuring tape.
When marking the mounting positions for corner fittings, ensure that the four
lines form a rectangle.
Step 4 Adjust the device in the required direction, connect the steel hoisting ropes, and
hoist the device onto the concrete platforms.
When hoisting a device, ensure that the four corner fittings of the device are
aligned with the marked mounting positions for corner fittings on the concrete
platforms.
Issue 02 (2021-04-15)
NO TICE
NO TICE
Copyright © Huawei Technologies Co., Ltd.
3 System Installation (Building Scenario)
(2) Concrete platform
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-e240h4

Table of Contents