FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
4.3.2 Securing Devices
Context
Figure 4-4 Port reserved for combining smart cooling products
(1) Reserved port for combining units on the
end
Procedure
Step 1 Connect the hoisting ropes and hoist the equipment to the installation area.
Issue 02 (2021-04-15)
NO TE
It is recommended that a crane with a lifting capacity greater than or equal to 15 t be used
for transportation.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation (FDC Scenario)
(2) Reserved port for combining units on the
side
72