1B-38 AIR CONDITIONING (OPTIONAL)
INSTALLATION
Reverse removal procedure for installation, and then note the fol-
lowing instructions.
• Replenish specified amount of compressor oil to compressor
suction side by referring to "Replenishing Compressor Oil" in
this section.
• Evacuate and charge refrigerant by referring to "Evacuation"
and "Charging" in this section.
Dual Pressure Switch
INSPECTION
1) Check dual pressure switch (1) for continuity at normal tem-
perature (approximately 25 °C (77 °F)) when A/C system has
a proper charge of refrigerant and A/C system (compressor)
is under operation. In each of these cases, switch should
show proper continuity.
2) Check switch for continuity at specified pressure as shown.
A : Approximately 195 kPa (1.95 kg/cm
B : Approximately 3140 kPa (31.4 kg/cm
C : Approximately 225 kPa (2.25 kg/cm
D : Approximately 2550 kPa (25.5 kg/cm
Tightening torque
Dual pressure switch
(a) : 10 N·m (1.0 kg-m, 7.0 lb-ft)
2
, 27.5 psi)
2
, 446.5 psi)
2
, 32.0 psi)
2
, 362.5 psi)