Suzuki Jimny Service Manual page 210

Jimny suzuki
Hide thumbs Also See for Jimny:
Table of Contents

Advertisement

INSTALLATION
1) Install bushings (1) by using hydraulic press and special
tools, noting the following point.
• Install bushings (1) so that either face of bushing are aligned
with housing edge of leading arm (2), also the length
between the aligned side end of bushing and leading arm (2)
are within specification below.
Special tool
(A) : 09913-85210
(B) : 09951-26010
Specification for leading arm bushing protrusion
"a" : 8.5 – 10.5 mm (0.33 – 0.41 in.)
"b" : 6.0 – 9.0 mm (0.24 – 0.35 in.)
2) Install leading arm (1) to vehicle body and axle housing,
referring to figure for proper installing direction of bolts.
Nuts should not be tightened.
3) Install shock absorber lower mounting bolt, refer to "Front
Shock Absorber" in this section.
4) Install air locking hub vacuum pipe clamp bolts and tighten
them to specified torque (for 4WD).
Tightening torque
Vacuum pipe clamp bolts
(b) : 5.5 N·m (0.55 kg-m, 4.0 lb-ft)
5) Lower hoist and with vehicle in non-loaded condition, tighten
nuts of leading arm to specified torque.
Tightening torque
Leading arm nuts
(a) : 90 N·m (9.0 kg-m, 65.0 lb-ft)
2. Vacuum hose
3. Body outside
[A] : Front
[B] : Rear
FRONT SUSPENSION 3D-37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn413

Table of Contents