Lspv Assembly - Suzuki Jimny Service Manual

Jimny suzuki
Hide thumbs Also See for Jimny:
Table of Contents

Advertisement

LSPV Assembly

INSPECTION AND ADJUSTMENT
1) Confirm the following before inspection and adjustment.
• Fuel tank is filled with fuel fully.
• Vehicle is equipped with spare tire, tools, jack and jack han-
dle.
• Vehicle is free from any other load.
• Place it on level floor.
2) Push up LSPV lever with finger till it stops and measure
length of coil spring ("a" in figure).
3) Spring length "a" should be as specified.
Spring length "a"
147 mm (5.79 in.)
4) If it isn't, adjust it to specification by changing stay position
as shown in figure. After adjustment, tighten bolt to specified
torque.
Tightening torque
LSPV adjust bolt
(a) : 25 N·m (2.5 kg-m, 18.0 lb-ft)
NOTE:
Check to make sure that LSPV body and brake pipe joints
are free from fluid leakage. Replace defective parts, if
any.
BRAKES 5-43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn413

Table of Contents