Checking The Contents - Canon Finisher-AK1 Service Manual

Table of Contents

Advertisement

Checking the Contents

[2] Latch Receiver (Front)
[1] Finisher X 1
X 1
The figure shows
Saddle Finisher-AF2
[4] Positioning Pin X 1
[6] Coaxial Connector X 1
[7] Shunt Cable X 1
[9] Screw
[10] Guide Map Label X 1
(RS tightening; M4x10)
AK1 only
X 10
Use 8 of them
(2 screws are for spare)
7
Installation > Checking the Contents
[3] Latch Receiver (Rear)
X 1
[5] ARCNET Cable X 1
[8] Wire Saddle X 1
[11] Guide Map Label X 1
AK2 only
F-7-5
7
Installation > Checking the Contents
[12] Staple Label X 1
[13] LED Lamp Label X 1
AF2 only
Included in Europe,
Asia/Oceania
[15] Power Cord X 3
[16] Power Cord X 1
Included in Europe,
Asia/Oceania
Included in USA
[18] Saddle
Staple Cartridge X 2
AF2 only
[15] : The configuration of the connector varies depending on the country/region.
Use the correct power cord to match the location/area of installation.
Be sure to bring back the unused Power Cordes.
< CD/Guides >
• FCC/IC sheet (USA only)
• Perchlorate Notice sheet (USA only)
• TAIWAN Battery leaflet (Europe, Asia/Oceania only)
7-4
[14] Saddle Return
Attention Label X 1
AF2 only
[17] Staple Cartridge X 3
F-7-6
7-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Finisher-ak2

Table of Contents