UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Figure 6-25 Securing the cabinets
Step 8 Install the removed side panel on the side of the bottom cabling cabinet.
Step 9 Install anchor baffle plates.
Figure 6-26 Installing anchor baffle plates
----End
Issue 03 (2021-08-03)
Copyright © Huawei Technologies Co., Ltd.
6 Installation
91