UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
6.3.2.2 Installing Cables
Context
Procedure
Step 1 Open the front door of the cabinet, remove the power distribution cover, and
remove the top cover as required.
Figure 6-29 Removing the covers
Step 2 Remove the bottom cabling cover from the bottom cabling cabinet.
Step 3 Install ground cables.
Issue 03 (2021-08-03)
NO TE
The number and colors of cables in the figures are for reference only.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
93