Figure 6-50 Hole positions on the channel steel (optional)
(1) Hole positions on the channel steel (The figure uses the C-shaped channel steel with the
opening facing downwards and one cabinet as an example. The figure shows the hole positions
on the channel steel when the cabinet is not installed against a wall. The channel steel model,
installation mode, whether holes need to be drilled on its sides, hole size, and the actual
number of cabinets are determined based on site survey data.)
Figure 6-51 Recommended channel steel dimensions (unit: mm)

6.3.4.2 Installing Cables

Procedure
Step 1 Install cables, top frames, and mounting plates. For details, see
Cables.
----End

6.4 Single UPS Installation (800 kVA)

When you install the UPS and connect cables, do not step on the front door baffle
plate and the door support at the bottom of the cabinet to prevent paint flake-off
and deformation. Otherwise, the front door will not be properly closed.