UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Figure 6-22 Hole dimensions (unit: mm)
(1) UPS
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion sleeves in the holes.
1.
2.
3.
4.
Knock the expansion bolts into the holes until the expansion sleeves completely fit
into the holes. The expansion sleeves must be completely buried under the ground
to facilitate subsequent installation.
Issue 03 (2021-08-03)
Drill a hole into the concrete floor using a hammer drill. The hole depth
ranges from 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) Bottom cabling cabinet (optional)
6 Installation
89