UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Before performing a capacity test, ensure that:
● The UPS is working in normal mode; float charging or hibernation has lasted
● The UPS generates no battery overtemperature, overvoltage, or overcurrent
● The mains, batteries, charger, and discharger are normal. No overload alarm is
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Capacity Test to start a capacity test.
Figure 7-14 Starting a capacity test
----End
7.6.2 Lithium Battery Test
Issue 03 (2021-08-03)
NO TICE
for 2 hours after the SOC reaches 100%; the load rate fluctuation is less than
10%.
alarm. No generator is connected to the UPS.
generated.
NO TE
The capacity test automatically stops in any of the following cases:
● The battery discharge voltage reaches the EOD voltage plus 0.01 V.
● The load fluctuation exceeds 10%.
● An alarm is generated.
When the battery discharge voltage reaches the EOD voltage plus 0.01 V, the test is
complete. The test data is obtained from the capacity test. Based on monthly capacity test
data, select the test data obtained from a capacity test that has the maximum discharge
capacity as the current-month test data. Save the test data obtained from the latest 36
tests.
Copyright © Huawei Technologies Co., Ltd.
7 Single UPS Commissioning
164