UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Automatic Shallow Discharge Test
Step 1 On the home screen of the LCD, choose System Info > Settings > Battery
Settings and set Sched. shallow dis. test to Enable.
Step 2 Set Sched. shallow dis. test time and Sched. shallow dis. test interval as
required. After setting is complete, the system will perform an automatic shallow
discharge test based on the settings.
----End
Manual Shallow Discharge Test
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Shallow Dis. Test to start a shallow discharge test.
Figure 7-13 Starting a shallow discharge test
----End
7.6.1.3 Performing a Capacity Test
Context
This item allows you to fully discharge batteries. A deep discharge test is
conducted to obtain the battery discharge performance data.
Issue 03 (2021-08-03)
NO TE
When the battery test is completed normally, the test data is used as common test data.
Record the data obtained from the latest five tests.
The shallow discharge test automatically stops in any of the following cases:
● The battery discharge capacity reaches the specified value (10%–50%, 20% by default).
● The discharge voltage reaches the warning threshold (calculated in real time).
● The load rate fluctuation exceeds 10%.
● An alarm is generated.
Copyright © Huawei Technologies Co., Ltd.
7 Single UPS Commissioning
163